ATM_ID: 6C46ECD6-81C5-1014-A7B6-9639414B9F41
MFF:
PLANNEDTIMESTAFF:
ID: DPQA_Regression_COPY-PRINT/Testcases/SPAR/R15-08R15-11R16-02_TCs/55916
TESTCASE_HEADLINE: To Verify whether the copy job is completed successfully after pressing the Resume button from the "Document Feeder with Cancel and Resume" popup.
GROUP:
FEATURE:
SUB_FEATURE:
INPUT:
PROCEDURE:
- Load a set of paper(any size) as input document into the DADF.
- Physically hold the bottom sheet of paper to prevent it from feeding in the DADF, but the top sheet will be allowed to feed.
- Start Copy job.
- After the Jam occurs with the bottom sheet in top of the scanner.
- Re-insert the sheets of paper.
- Touch the "Resume" button on the LUI.
OUTPUT: 1."Document Feeder with Cancel and Resume" status should be raised after pressing the Resume button.
2.The Job should completed successfully.
3.In Completed Jobs tab ,Copy job should show completed state.
4.The completed state should be displayed in audit log.
PROCESS:
PRIORITY:
TEST_TYPE:
LOE:
RESOURCE_HW:
RESOURCE_CONSUMEABLES:
RESOURCE_MEDIA:
SKILL_SET:
TEST_CASE_TYPE:
TESTCASE_SOURCE:
SPEC:
SPEC_VERSION:
SPEC_TAG: Mapping Not Required
ATM_OWNER:
APPROVE_QE:
APPROVED_QE:
APPROVE_SE:
APPROVED_SE:
APPROVE_SPAR:
APPROVED_SPAR:
ASSOCIATED_TESTCASES:
TRAINING:
TESTCASE_VERSION:
TESTCASE_STATE:
TESTCASE_PLATFORM:
TESTCASE_PRODUCT:
TESTCASE_APPROVALS:
CDATE: 1462016145
MDATE: 1462016145
MUSER: w3VBWMNB
AUTHOR: w3VBWMNB
ATM_MCOMMENTS: Imported from CSV
HISTORY:
ATM_LOCKED:
ATM_REQLINK:
ATM_REQCOUNT: 0
QA_TEAM:
TC_WEIGHTAGE:
FILENAME:
FILEDESC:
FILES: