ATM_ID: 6C60FCE0-81C5-1014-8F20-B67C6408B959 MFF: PLANNEDTIMESTAFF: ID: DPQA_Regression_COPY-PRINT/Testcases/SPAR/R15-08R15-11R16-02_TCs/55924 TESTCASE_HEADLINE: To verify that job submitted via LPR-Reliability tool command should print all the pages. GROUP: FEATURE: SUB_FEATURE: INPUT:

1.Download 00003.PRN file should be downloaded from IBM clearquest and save it in PC

PROCEDURE:

  1. Load 8.5x11 Letter / Plain / White paper in Tray 1 and Bypass trays. Confirm each when prompted.
  2. Open the Reliability tool and mention the ip address of the MFP
  3. Click on "View/Change Test properties". Uncheck the "Infinite" option and enter the value as "1" and click "OK" in the tool.
  4. Browse the file and add the file “00003.PRN”
  5. Click on the "LPR " option which will display under "Printing and Monitoring Threads". Verify the confirmation (1),(2).
  6. Print a Configuration Report from the Information Pages. verify(1),(2).
OUTPUT:

  1. The Job should get printed successfully.
  2. In the Completed Jobs tab it should show as Completed.
PROCESS: PRIORITY: TEST_TYPE: LOE: RESOURCE_HW: RESOURCE_CONSUMEABLES: RESOURCE_MEDIA: SKILL_SET: TEST_CASE_TYPE: TESTCASE_SOURCE: SPEC: SPEC_VERSION: SPEC_TAG: Mapping Not Required ATM_OWNER: APPROVE_QE: APPROVED_QE: APPROVE_SE: APPROVED_SE: APPROVE_SPAR: APPROVED_SPAR: ASSOCIATED_TESTCASES: TRAINING: TESTCASE_VERSION: TESTCASE_STATE: TESTCASE_PLATFORM: TESTCASE_PRODUCT: TESTCASE_APPROVALS: CDATE: 1462016145 MDATE: 1462016145 MUSER: w3VBWMNB AUTHOR: w3VBWMNB ATM_MCOMMENTS: Imported from CSV HISTORY: ATM_LOCKED: ATM_REQLINK: ATM_REQCOUNT: 0 QA_TEAM: TC_WEIGHTAGE: FILENAME: FILEDESC: FILES: