ATM_ID: 6C647555-81C5-1014-BB70-F8FB3E2455FE
MFF:
PLANNEDTIMESTAFF:
ID: DPQA_Regression_COPY-PRINT/Testcases/SPAR/R15-08R15-11R16-02_TCs/55925
TESTCASE_HEADLINE: To verify that job submitted via RAW-Reliability tool command should print all the pages.
GROUP:
FEATURE:
SUB_FEATURE:
INPUT:
1.Download 00003.PRN file should be downloaded from IBM clearquest and save it in PC
PROCEDURE:
- Load 8.5x11 Letter / Plain / White paper in Tray 1 and Bypass trays. Confirm each when prompted.
- Open the Reliability tool and mention the ip address of the MFP
- Click on "View/Change Test properties". Uncheck the "Infinite" option and enter the value as "1" and click "OK" in the tool.
- Browse the file and add the file “00003.PRN”
- Click on the "RAW " option which will display under "Printing and Monitoring Threads". Verify the confirmation (1),(2).
- Print a Configuration Report from the Information Pages. verify(1),(2).
OUTPUT:
- The Job should get printed successfully.
- In the Completed Jobs tab it should show as Completed and The completed state should be displayed in audit log.
PROCESS:
PRIORITY:
TEST_TYPE:
LOE:
RESOURCE_HW:
RESOURCE_CONSUMEABLES:
RESOURCE_MEDIA:
SKILL_SET:
TEST_CASE_TYPE:
TESTCASE_SOURCE:
SPEC:
SPEC_VERSION:
SPEC_TAG: Mapping Not Required
ATM_OWNER:
APPROVE_QE:
APPROVED_QE:
APPROVE_SE:
APPROVED_SE:
APPROVE_SPAR:
APPROVED_SPAR:
ASSOCIATED_TESTCASES:
TRAINING:
TESTCASE_VERSION:
TESTCASE_STATE:
TESTCASE_PLATFORM:
TESTCASE_PRODUCT:
TESTCASE_APPROVALS:
CDATE: 1462016145
MDATE: 1462016145
MUSER: w3VBWMNB
AUTHOR: w3VBWMNB
ATM_MCOMMENTS: Imported from CSV
HISTORY:
ATM_LOCKED:
ATM_REQLINK:
ATM_REQCOUNT: 0
QA_TEAM:
TC_WEIGHTAGE:
FILENAME:
FILEDESC:
FILES: