ATM_ID: 742C011D-73A2-1014-B6C0-D6A156619FB6 MFF: PLANNEDTIMESTAFF: ID: DPQA_Regression_COPY-PRINT/Testcases/SPAR/R16-08_Test_Cases/83301 TESTCASE_HEADLINE: [SFR]->CQGbl00880438_5 Tray Management - Check tray confirmation screen behavior GROUP: FEATURE: SUB_FEATURE: INPUT:

  1. Make sure the device has no known printing / scanning or tray handling problems.
  2. Make sure the device is loaded with R16-02 release software followed by Mexican SFR patch install DLM
PROCEDURE:

  1. Open tray 1, load it with 8.5 x 13.4 media
    and close.
  2. The tray confirmation screen should be seen on local UI. Expand the paper size selection button in it.
  3. Observe the various sizes available in the list.
  4. Select 8.5 x 13.4 from the list and confirm.
OUTPUT:

  1. 8.5 x13.4" should be available in the size list provided on expanding the size button in step-3
  2. On confirmation with the mexican size in step-4, the confirmation screen shall close with out any problems.
PROCESS: PRIORITY: TEST_TYPE: LOE: RESOURCE_HW: RESOURCE_CONSUMEABLES: RESOURCE_MEDIA: SKILL_SET: TEST_CASE_TYPE: TESTCASE_SOURCE: SPEC: SPEC_VERSION: SPEC_TAG: Mapping Not Required ATM_OWNER: APPROVE_QE: APPROVED_QE: APPROVE_SE: APPROVED_SE: APPROVE_SPAR: APPROVED_SPAR: ASSOCIATED_TESTCASES: TRAINING: TESTCASE_VERSION: TESTCASE_STATE: TESTCASE_PLATFORM: TESTCASE_PRODUCT: TESTCASE_APPROVALS: CDATE: 1476023211 MDATE: 1476023211 MUSER: w4939RDM AUTHOR: w4939RDM ATM_MCOMMENTS: Imported from CSV HISTORY: ATM_LOCKED: ATM_REQLINK: ATM_REQCOUNT: 0 QA_TEAM: TC_WEIGHTAGE: FILENAME: FILEDESC: FILES: