TEST_TYPE: manual INPUT:

1: The user has already performed the steps mentioned in "Navigate through to IPP page and enable IPP" test procedure to navigate to IPP page. 2: IPPtool is installed on the MAC PC. 3: Faxcard is available for testing ipp faxout

FILES: AUTOMATION_GROUP: AUTOMATABLE: yet_to_be_analyzed ACTION_TO_BE_DONE: CONSTRAINTS_DAR: IMP_98: High Level check\ Remarks: \ Owner: Karthika TESTCASE_MODIFICATION_REQUIRED: no MFF: SPEC: FS 55.041 Internet Printing Protocol (IPP) TESTCASE_FAMILY: HISTORY: REASON_FOR_AUTOMATABLE: CDATE: 1683887650 TESTCASE_APPROVALS: TESTCASE_STATE: OUTPUT:

Fax jobs which are not completed are returned in response.

RESOURCE_HW: MDATE: 1683887650 APPROVED_SPAR: TEST_CASE_TYPE: sanity TC_WORK_LOCATION_CAT: work_from_office_tc AUTHOR: q3SJKS2P GROUP: MUSER: q3SJKS2P SPEC_TAG: [D2.6 - *][55.041.022] (FT-14285) SPEC_NUM: PROCEDURE:

1: From the ipptool submit the bunch of ipp faxout jobs as shown below :- ipptool -tv -f $file ipp://$device-ip/ipp/faxout fax-job.test repeat the above command with different files if required or use the same files to submit the ipp faxout job again. 2: Now send which-jobs test to get the test files which ar enot complete using command line ipptool as shown below :- ipptool -tv ipp://$device-ip/ipp/faxout which-jobs-fax.test and verify the jobs which are not completed are returned in response.

DEVELOPMENT_COMPLETE_TIME: ATM_LOCKED: 0 PRECONDITION_TO_BE_DONE: PO_SIGNOFF_DATE: APPROVE_SPAR: RELEASE: TESTCASE_PRODUCT: FILENAME: ATM_MCOMMENTS: Copied from "WFAST_Discovery_Regression_Connectivity/Testcases/FS_55.041_Internet_Printing_Protocol_IPP/18170". RESOURCE_MEDIA: COMMONALITY_DETAILS: PRIORITY: COMMON_FUNCTIONALITY: APPROVED_QE: TESTCASE_HEADLINE: [D2.6 - *] (FT-12667) {CQGbl00429269} The Xerox MFD shall support the IPP Attributes "which-jobs" TESTCASE_VERSION: FEATURE: APPROVE_SE: SPEC_VERSION: TESTCASE_PLATFORM: FILEDESC: PROCESS: TC_WEIGHTAGE: COMPLEXITY_OUTPUT_VALIDATION: non_outliers SKILL_SET: TESTCASE_SOURCE: APPROVE_QE: COMPLEXITY_PRECONDITIONS: 0 TESTCASE_STEPS_ARE_RELATED_TO: APPROVED_SE: PLANNEDTIMESTAFF: ATM_OWNER: LOE: ASSOCIATED_TESTCASES: TRAINING: ATM_REQLINK: F80071E0-78A6-1014-B4BB-A5C395233859, FC705B1D-78A6-1014-82CE-BC3FFDDFFD50 DEVICE_CATEGORY: mfp SUB_FEATURE: RESOURCE_CONSUMEABLES: AUTOMATION_TC_VALIDATION: QA_TEAM: ATM_ID: 729695BA-7F9F-11EF-8A42-99F16D3DB5FC APTEST_UPDATE_STATUS: no ATM_REQCOUNT: 2 COMPETENCY: wfast_connectivity AUTOMATION_CANDIDATE: no